Dickinson Road Utilities Project

 




Project Description

Engineering staff are developing plans to replace the aging water main under Dickinson Road, as well as address stormwater ponding issues at various locations along this road. The design efforts will occur during 2017, followed by actual construction in early summer 2018.


  Aerial VicMap.PNG
 Schedule
2017 Design Process
May 2018 Advertise for Construction
June 2018 Contract Award to Construction Contractor
June 2018 Construction Begins
Sept. 2018 Construction Completion
 Status
Project design phase is underway.
Project Updates
For more information contact:
Kim Klinkers, PE  
360-863-4531
Email

Project Updates
5/1/17 - The topographic survey is complete. Engineering staff are reviewing site constraints and coordinating needs with the geotechnical consultant as part of gathering existing site information.

2/3/17 - A topographic survey of the project area is underway. This will provide background information to design with.