Powell Street Reconstruction

Up-link to Traffic Calming Guidelines

/DocumentCenter/View/12432

Project Open House 2022
A virtual Open House will be conducted on January 12, 2022 between 7:00 PM and 8:00 PM.  Here is the link to the meeting:

https://us02web.zoom.us/j/85437596705


City Staff will make a presentation and allow for questions/comments at the end of the presentation. Please limit your comments to the concept design and project area.

 The preferred Concept drawing is available using the link below:

Preferred Concept Drawing

Project Description

This project's objective is to reconstruct a portion of Powell Street, specifically the block between S. Kelsey Street and S. Sams Street. This segment has a poor pavement condition and localized stormwater ponding issues. 

The City looks to capitalize on full pavement depth reconstruction projects such as this by researching the existing underground utilities and determining if they are candidates for replacement due to age or maintenance issues. As such, an existing water main will also be replaced.

Another opportunity exists at the intersection with S. Sams Street. The current layout has Powell street "jogging" through the intersection, which is not ideal for traffic operations.


Opinion Survey 2021

The City is looking at options to improve this intersection and invite you to participate in an online survey and virtual open house presentation. Please use the following links to participate in these events:

5/25/2021 - The Opinion Survey has been closed
​4/26/2021 -Issues with ranking for questions 2&3 have been resolved 

Design Alternatives

Opinion Survey

PLEASE NOTE: WE HAVE POSTPONED THE PROJECT PRESENTATION TO THE CITY COUNCIL THAT WAS SCHEDULED FOR NOVEMBER 16.  SEE BELOW FOR MORE INFORMATION

Project Updates

Jan. 31, 2022

City held a virtual open house on 1-12-2022 with a fair attendance.  Much input from the public.  Preferred Concept design will be presented to Council at the Study Session on February 1, 2022.  

Jan. 4, 2022

Staff will conduct a virtual Open House on Wednesday, January 12, 2022 from 7:00 to 8:00 PM.  

Nov. 30, 2021

Staff is working towards a virtual open house for residents to review the concept design. 

Nov. 11, 2021

Staff intended to present the concept design to City Council on November 16, 2021. However, it was decided that another community engagement event needs to be conducted to discuss the results of the April 2021 community survey and the resulting concept design. Staff will be inviting the community again to discuss the project in late November or in December. Afterward, the project will be rescheduled for a future council meeting.

Oct. 28, 2021

Staff is working on revising the drawings to comply with City ordinances and guidelines.  

Sept. 29, 2021

City Council has approved the Traffic Calming Guidebook.  Staff will restart design work to include allowed traffic calming items as are practical for this project.  

June 28, 2021

The project design development is paused while City staff review the public comments received during the June 8th council meeting. 

June 10, 2021

Please note: The Council will not be discussing the project during the upcoming June 15th council meeting. The project design development is paused while City staff review the public comments received during the June 8th council meeting. We appreciate the citizen comments and concerns about traffic issues and look forward to resuming the design efforts at a later time.

May 26, 2021

City Staff has, after several meetings and discussions, review of citizen comments, review of survey results and verifying compliance with City Code come to the following design criteria.  The intersection at Powell and Sam's will not line up but instead be off-set, Powell will have a 10-foot drive lane, 8-foot parking lane, planter and sidewalk on each side per City standards, the back of new sidewalk on the south side of Powell will remain at the same location as the back of the existing sidewalk, the new sidewalk on the north side of Powell will match the layout on the south side, There will be no loss of legal parallel parking along Powell, bulb-outs will be installed on the west side of the intersection of Powell and Sam's and the east side of the intersection of Powell and South Kelsey.

April 29, 2021

City has a survey link above seeking public input on alternate configurations for the intersection of Sams St. and Powell St.  Please review the Design Alternatives before taking the Opinion Survey.  You may find it beneficial to have both open at once.  This project is still in the Scoping phase.

Project Timeline

Phase Target Date
Design 2021
Construction Begins Summer 2022
Construction Ends Summer 2022

Project Location

Powell St Vicinity Map IMAGE